Project consists of removing existing hot water radiation and unit ventilators. Providing roof mounted energy recovery units with condensing units will be used to provide ventilation air to each space. The existing pneumatic temperature control system will be replaced with a direct digital control system. Architectural work to include acoustical ceiling panel replacement, floor polishing, light fixture replacement, marker board replacement, wall repair, wall painting, casework replacement, and patching required for mechanical work.
Architectural and Structural plans
00 00 00 Addendum No. 1 for Sand Creek 21046.1 9-8-22
00 00 00 Addendum No. 2 for Sand Creek 21046.1 9-20-22
Date :
City : Coon Rapids
State : MN
Project Manager(s): Ellis Polling
City : Coon Rapids
State : MN
Project Manager(s): Ellis Polling