Project consists of removing existing hot water radiation and unit ventilators. Providing roof mounted energy recovery units with condensing units will be used to provide ventilation air to each space. The existing pneumatic temperature control system will be replaced with a direct digital control system. Architectural work to include acoustical ceiling panel replacement, floor polishing, light fixture replacement, marker board replacement, wall repair, wall painting, casework replacement, and patching required for mechanical work.

Architectural and Structural plans

Mechanical Drawings

Electrical Drawings

Spec Volume 1

Spec Volume 2

Spec Volume 3

Spec Volume 4

00 00 00 Addendum No. 1 for Sand Creek 21046.1 9-8-22

E4-1R1

E4-2R1

E6-1R1

ED-1R1

00 00 00 Addendum No. 2 for Sand Creek 21046.1 9-20-22

A11.1 R1

A2.1 R1

A3.1 R1

E6-1R2

M10-1R1

M9-1R1

00 00 00 Addendum No. 3

A3.1 R2

 

 

 